The minister announced that energy workers are forced to apply hourly power outage schedules. This applies to 12 regions of the country.
Due to the threat of a Russian attack, train traffic in the Sumy direction is complicated, and there is no voltage in the contact network in certain sections. Two railway workers were injured and hospitalized.
Peru's Council of Ministers has declared a 30-day state of emergency in Lima and Callao. This will allow for increased coordination between security agencies and combat rising crime.
DTEK announced the electricity shutdown schedules for household consumers in Kyiv on October 23. The shutdowns will occur in queues, covering different time intervals throughout the day.
Explosions rocked a plastics factory in Chelyabinsk Oblast, with eyewitnesses reporting a fire.
On October 23, from 07:00 to 23:00, rolling blackouts will be applied in most regions of Ukraine, affecting up to three queues simultaneously. This applies to both household and industrial consumers.
Northern communities of Chernihiv region faced the most difficult situation with electricity supply due to repeated attacks on the energy system, which led to emergency blackouts.
After Russian shelling, Chernihiv region found itself in a complete blackout. The authorities deployed dozens of "points of invincibility," the police intensified patrols, and critical infrastructure switched to generators, which caused interruptions in water supply and low voltage in the network.
From 4:00 PM, all regions that experienced emergency shutdowns will have hourly outage schedules introduced, affecting up to three queues simultaneously. Also, from 4:00 PM to 10:00 PM, power limitation schedules will be in effect for industrial consumers.
Several regions of Ukraine, including Sumy, Zhytomyr, Poltava, Cherkasy, Kirovohrad, Kharkiv, Chernihiv, Dnipropetrovsk and Kyiv regions, switched to hourly power outage schedules on October 22. This happened instead of emergency blackouts, which were canceled in some regions.
An additional 1. 5 billion Norwegian kroner (about $150 million) will be allocated for electricity and heating. The funds come through the EU Investment Framework for Ukraine.
After Russian strikes in Chernihiv, all critical infrastructure, including "Vodokanal" (water utility), switched to generator power. In Novhorod-Siverskyi, the enemy struck the city center, damaging a hospital, stadium, educational institution, and residential buildings.
In Ukraine, a number of regions are switching to hourly power outage schedules instead of emergency ones. However, in some regions, emergency shutdowns continue to be in effect.
On October 22, power restriction schedules for industrial consumers will be in effect in Ukraine from 4:00 PM to 10:00 PM due to the consequences of Russian shelling. The most difficult situation is observed in Sumy and Chernihiv regions, where energy workers are carrying out restoration work.
As a result of Russia's night attack on October 22, 6 people were killed in Kyiv and Kyiv Oblast, and at least 35 were injured in various regions. Residential areas, energy, port, and industrial facilities were damaged.
The heating season has already started in many regions of Ukraine, with Rivne region being the first to "turn on the heating". Some frontline regions are still preparing for heat supply.
Ukrainian President Volodymyr Zelenskyy stated that Russia's night attack indicates insufficient pressure on Russia. He called for a strong sanctions package from the EU, the US, and the G7, as well as coordinated diplomacy.
As a result of the night attack by Russian occupiers on Ukraine's energy infrastructure, 27 settlements in the Kirovohrad region have been disconnected from the power supply. Relevant services are already eliminating the consequences of the shelling.
As a result of a Russian strike on a DTEK energy facility in the Odesa region, 14,200 families received electricity after reconnection. The damage is significant, and repairs will take a long time.
After Russia's massive night attack on energy infrastructure, emergency power outages have been introduced in most regions of Ukraine. The Ministry of Energy announced the start of restoration work and called for rational use of electricity.
As a result of a massive Russian attack, infrastructure was damaged, leading to delays and changes in routes for Ukrzaliznytsia trains. Trains No. 43/44 Ivano-Frankivsk - Cherkasy and No. 793/794 Cherkasy - Kyiv are running with delays of up to two hours.
On the morning of October 22, emergency power outages were introduced in Kyiv and at least 7 regions. This happened at the direction of NEC "Ukrenergo".
As a result of the night shelling of Zaporizhzhia on October 22, about 2,000 people were left without electricity. Work to eliminate the consequences will begin after the security situation allows.
On the night of October 22, Russia attacked Ukraine's energy infrastructure. Energy workers will begin restoration work as soon as security conditions allow.
Russian troops attacked Izmail in Odesa region, damaging energy and port infrastructure. Power supply is being restored, there are no casualties.
In Odesa, work continues to restore electricity supply after enemy attacks. Approximately 11,000 subscribers remain without power, while power has been restored for almost 9,000 consumers.
President Zelenskyy held a conversation with Spanish Prime Minister Sanchez, discussing steps to strengthen Ukraine's defense and energy aid. The parties coordinated diplomatic work and agreed to meet for further support of Ukraine.
Tropical Storm Melissa, the 13th Atlantic storm of 2025, threatens severe flooding and landslides in Haiti, the Dominican Republic, Jamaica, Puerto Rico, and Aruba. Melissa's wind speeds reach 80 km/h, and meteorologists warn of dangerous weather throughout the weekend.
President Zelenskyy held a meeting with Umerov, outlining priorities: preparing defense agreements to strengthen aviation and meetings with European leaders. Also a priority is the agenda of Staff meetings.
A hurricane has hit New Zealand, causing transport and power disruptions. In the country's capital, a man died due to a broken branch, and over 10,000 homes were left without electricity.