The railway has stabilized the power supply situation after outages, delays are minimal - Ukrzaliznytsia

 • 2339 переглядiв

Power supply on the railway has been restored in almost all regions, trains are running on schedule. Kyiv City Express has resumed service with 20-30 minute delays.

Ukrzaliznytsia has stabilized the situation with energy supply after the outages, the company reported on Saturday, writes UNN.

The situation with energy supply on the railway, which arose due to external power outages, has been stabilized. Power supply has been restored in almost all regions - trains continue to run on their routes. Delays from the schedule are minimal and will be caught up.

- stated in UZ.

At the stations, as noted, there is light and heating, and heating points are operating normally.

"Kyiv City Express has resumed movement. Estimated delays are 20-30 minutes. We are catching up with the schedule as much as possible," the message says.

Ukrainian cities hit by emergency power outages: metro stopped, water supply disrupted31.01.26, 11:29

Popular
News by theme
Mercedes unveils new armored S-Class for world leaders

 • 10273 переглядiв

Ukraine to play France in Euro 2026 Futsal Quarterfinals

 • 2752 переглядiв

Ukrainian cities hit by emergency power outages: metro stopped, water supply disrupted

 • 14171 переглядiв

Kyiv metro temporarily stopped due to power outage - Kyiv City State Administration

 • 3133 переглядiв

Actor Gene Hackman's estate put up for sale almost a year after his death

 • 43069 переглядiв

Traffic restored on main roads after weather-related restrictions - road workers

 • 3825 переглядiв