NASA postpones astronaut moon mission to March due to fuel leak

 • 4742 переглядiв

NASA's Artemis II mission has been postponed until March due to a hydrogen fuel leak during a dress rehearsal. This malfunction occurred during the fueling of the Space Launch System rocket.

The long-awaited NASA Artemis II mission, which was supposed to return people to the Moon for the first time in more than half a century, has been postponed until at least March. The reason for the delay was a hydrogen fuel leak detected during a critical dress rehearsal at the Kennedy Space Center launch pad in Florida. This was reported by AP, writes UNN.

Details

The technical malfunction occurred during the fueling of the giant Space Launch System (SLS) rocket with supercooled liquid hydrogen and oxygen. Engineers detected a leak at the fuel line connection, which caused the automatic system to stop the countdown at 5 minutes and 15 seconds. This is the same problem that plagued the rocket during its debut test three years ago, as hydrogen is an extremely volatile and flammable molecule.

NASA postponed the launch of the Artemis II mission due to anomalous cold weather at the spaceport31.01.26, 15:44

In fact, it caught us off guard

– commented John Honeycutt from NASA a few hours after the sudden halt of the tests.

He explained the difficulty of working with this type of fuel: "When you're dealing with hydrogen, it's a small molecule. It's high energy, and we like it for that reason, and we do our best."

Schedule change and crew safety

Due to the incident, four astronauts – three Americans and one Canadian – were temporarily removed from quarantine. The delay until March will allow specialists to study the data in detail, replace seals, and conduct another full dress rehearsal of refueling before authorizing a manned flight.

Previously, NASA planned to launch this week, but crew safety remains a priority. Currently, officials are not naming an exact date for the repeat test, noting that it is necessary to completely eliminate the risks of repeated leaks at the complex rocket interface.

Fuel Leak During Artemis II Rehearsal: NASA Battles Issues for February Launch Window03.02.26, 01:58

Popular
IMF concerned about Ukraine's financing due to parliamentary delays

 • 13646 переглядiв

Trump asked China to postpone summit with Xi due to war with Iran

 • 10587 переглядiв

Teenagers sue Musk's company over pornographic images created by Grok

 • 13397 переглядiв

Ukrzaliznytsia changes routes and cancels a number of suburban trains

 • 17780 переглядiв

Europe to pay more for gas due to Middle East war - HSBC forecast

 • 6106 переглядiв

News by theme
NASA postpones astronaut moon mission to March due to fuel leak

 • 4742 переглядiв

US sends military contingent to Niger: first ground presence after strikes

 • 4507 переглядiв

Bitcoin plummets to lowest level since Trump's election victory

 • 4036 переглядiв

OpenAI plans to invest in AI-driven drug development in exchange for royalties

 • 3971 переглядiв

French prosecutors demand Marine Le Pen be banned from elections for five years

 • 20349 переглядiв

Ukraine to receive Tridon Mk2 "Shahed-killers" with funding from Sweden and Denmark

 • 20989 переглядiв

Donald Trump and Gustavo Petro held their first meeting at the White House

 • 4859 переглядiв

Tsikhanouskaya called on Lithuania to restore transport links with Belarus

 • 19188 переглядiв

Bus with pilgrims crashes in Brazil: 15 dead, including children

 • 4485 переглядiв