poland-starts-repair-work-at-one-of-its-checkpoints-on-monday

Poland starts repair work at one of its checkpoints on Monday

 • 31843 переглядiв

On Monday, August 12, according to information provided by the Polish side, repair work on the asphalt pavement at the Hrebenne-Rava-Ruska checkpoint will begin. This was reported by the Western Regional Directorate of the State Border Guard Service of Ukraine-Western Border, UNN reports .

Details

It is noted that the replacement of the pavement may cause traffic difficulties and longer waiting times, in particular for entry and exit to/from Poland in the freight direction and in the passenger direction for entry into Ukraine.

The work is expected to last until September 12, 2024.

We ask citizens to take the information into account and, if possible, choose other checkpoints to cross the border,

- the statement said.

Yagodin checkpoint on the border with Poland modernized: photo shown5/29/24, 3:51 PM

Popular

Bluesky wins as users flee X-Mask after US election: what's going on

 • 56278 переглядiв

The White Stripes withdraw lawsuit against Donald Trump

 • 78593 переглядiв

Actress Megan Fox is expecting her fourth child with Machine Gun Kelly

 • 65921 переглядiв

News by theme