khmelnytsky-npp-power-unit-brought-to-maximum-capacity-after-repairs

Khmelnytsky NPP power unit brought to maximum capacity after repairs

 • 24577 переглядiв

A power unit at Khmelnytsky NPP reached its maximum capacity after an early refurbishment, which was extremely important given the ongoing attacks on Ukraine's power grid.

A power unit at Khmelnytsky NPP has started operating at maximum capacity after a refurbishment. This was reported by the press service of Energoatom on Tuesday, UNN reports

Details 

As noted, one of the units of the Khmelnytsky NPP was repaired and returned to operation two weeks ahead of schedule.

According to Energoatom CEO Petro Kotin, it was "extremely important to return the unit to operation, given the constant attacks by the racists on the Ukrainian power system." 

Earlier, UNN reported that the Khmelnytsky NPP power unit was put back online after repairs. 

According to Energy Minister Herman Halushchenko, construction of four more units at Khmelnytsky NPP, two of which will be based on modern American AP1000 technology, will begin in 2024. As a result, Khmelnytsky NPP will become more powerful than Zaporizhzhya NPP. 

Popular

NABU accused of violating presumption of innocence in Solskyi case

 • 103674 переглядiв

International auditors have noted many years of red tape in NABU and HACC

 • 117834 переглядiв

Hungarian Prime Minister Orban arrives in Kyiv - media

 • 64083 переглядiв

News by theme