khmelnytsky-npp-power-unit-brought-to-maximum-capacity-after-repairs

Khmelnytsky NPP power unit brought to maximum capacity after repairs

 • 24737 переглядiв

A power unit at Khmelnytsky NPP has started operating at maximum capacity after a refurbishment. This was reported by the press service of Energoatom on Tuesday, UNN reports

Details 

As noted, one of the units of the Khmelnytsky NPP was repaired and returned to operation two weeks ahead of schedule.

According to Energoatom CEO Petro Kotin, it was "extremely important to return the unit to operation, given the constant attacks by the racists on the Ukrainian power system." 

Earlier, UNN reported that the Khmelnytsky NPP power unit was put back online after repairs. 

According to Energy Minister Herman Halushchenko, construction of four more units at Khmelnytsky NPP, two of which will be based on modern American AP1000 technology, will begin in 2024. As a result, Khmelnytsky NPP will become more powerful than Zaporizhzhya NPP. 

Popular

At least 67 people killed in Nigeria's charity rally stampede

 • 40301 переглядiв

Severe storm paralyzes transportation in Madeira

 • 16334 переглядiв

Fico tells what he talked about with Putin during a meeting in the Kremlin

 • 50238 переглядiв

News by theme