Khmelnytsky NPP power unit brought to maximum capacity after repairs

 • 25002 переглядiв

A power unit at Khmelnytsky NPP reached its maximum capacity after an early refurbishment, which was extremely important given the ongoing attacks on Ukraine's power grid.

A power unit at Khmelnytsky NPP has started operating at maximum capacity after a refurbishment. This was reported by the press service of Energoatom on Tuesday, UNN reports . 

Details 

As noted, one of the units of the Khmelnytsky NPP was repaired and returned to operation two weeks ahead of schedule.

According to Energoatom CEO Petro Kotin, it was "extremely important to return the unit to operation, given the constant attacks by the racists on the Ukrainian power system." 

Earlier, UNN reported that the Khmelnytsky NPP power unit was put back online after repairs. 

According to Energy Minister Herman Halushchenko, construction of four more units at Khmelnytsky NPP, two of which will be based on modern American AP1000 technology, will begin in 2024. As a result, Khmelnytsky NPP will become more powerful than Zaporizhzhya NPP. 

Popular
Arsenal talent Max Dowman received three honors at once from Guinness World Records

 • 9500 переглядiв

Programmer who ensured the landing of the "Apollo 11" mission on the Moon has died

 • 10547 переглядiв

Ukraine and Moldova are ahead of Georgia only in terms of negative indicators - Kobakhidze

 • 13599 переглядiв

Oil prices rise amid attacks on tankers and cuts to U.S. production

 • 9430 переглядiв

News by theme