Khmelnytsky NPP power unit brought to maximum capacity after repairs

 • 25008 переглядiв

A power unit at Khmelnytsky NPP reached its maximum capacity after an early refurbishment, which was extremely important given the ongoing attacks on Ukraine's power grid.

A power unit at Khmelnytsky NPP has started operating at maximum capacity after a refurbishment. This was reported by the press service of Energoatom on Tuesday, UNN reports . 

Details 

As noted, one of the units of the Khmelnytsky NPP was repaired and returned to operation two weeks ahead of schedule.

According to Energoatom CEO Petro Kotin, it was "extremely important to return the unit to operation, given the constant attacks by the racists on the Ukrainian power system." 

Earlier, UNN reported that the Khmelnytsky NPP power unit was put back online after repairs. 

According to Energy Minister Herman Halushchenko, construction of four more units at Khmelnytsky NPP, two of which will be based on modern American AP1000 technology, will begin in 2024. As a result, Khmelnytsky NPP will become more powerful than Zaporizhzhya NPP. 

Popular
What is celebrated on November 1 in Ukraine and around the world

 • 5298 переглядiв

The U.S. could launch a powerful strike against Iran if Republicans lose — Axios

 • 8418 переглядiв

One of Russia’s largest oil refineries caught fire in Kstovo, Russia, after an attack

 • 6560 переглядiв

Rubio called Ukraine's accession to NATO unrealistic - media

 • 4108 переглядiв

News by theme