Road repairs to begin near Rava-Ruska checkpoint on the border with Poland - possible delays

 • 3177 переглядiв

Road surface repairs will be carried out on the border with Poland until June 1. Traffic will be organized in one lane in a reversible mode, possible delays when crossing.

Repair work on the road surface at the Rava-Ruska checkpoint on the border with Poland will continue until June 1. Due to this, there may be changes in the rhythm of border crossing operations. This was reported by the State Border Guard Service, writes UNN.

From 09:00 on April 24, 2026 (approximately until June 1, 2026), repair work on the road surface will be carried out in the service area in front of the Rava-Ruska checkpoint on the Ukrainian side.

- the message says.

Repairs will be carried out in stages on the lanes for both entry into Ukraine and exit from Ukraine. In this regard, traffic will be organized in a two-way mode using one lane. During the period of work, minor changes in the rhythm of border crossing operations are possible.

The State Border Guard Service asks to take this information into account when planning your route and choose the optimal time for crossing the border.

Traffic through the Solotvyno - Sighetu Marmației checkpoint will be restricted for a month due to bridge repairs15.04.26, 17:46

Popular
What is celebrated on August 3 in Ukraine and the world

 • 9922 переглядiв

Trump stated readiness to strike Iran again at any moment

 • 7518 переглядiв

Belarus forms an airborne assault brigade 40 km from the border with Ukraine

 • 19505 переглядiв

News by theme