In Odesa region, critical infrastructure facilities have been partially reconnected to the power grid after the Russian attack; repairs will continue around the clock

 • 15898 переглядiв

In Odesa region, following the nighttime Russian attack, power engineers partially restored power to critical infrastructure facilities and restored electricity to 128.4 thousand households. Repair work is continuing around the clock.

In the Odesa region, following the Russian attack, critical infrastructure facilities were partially reconnected and power was restored to 128,400 households, UNN reports, citing DTEK.

During the day, DTEK power engineers partially reconnected critical infrastructure facilities and restored power to 128,400 households in the Odesa region after the Russian overnight attack

the statement said.

According to the company, repair work will continue around the clock.

We are doing everything possible to restore electricity to all Odesa residents as soon as possible. If you already have power, please do not switch on energy-intensive appliances at the same time. This will significantly help reduce the load on the damaged grid

DTEK concluded.

In Odesa region, 300,000 families were left without power after the Russian attack; a third have already had their electricity restored - Zelenskyy09.08.26, 20:27

Popular
In Monaco, banks have begun closing the accounts of wealthy Russians

 • 4120 переглядiв

Ben Affleck revealed why his ex-wife Jennifer Garner declined to star with him in a new film

 • 7474 переглядiв

Kendall Jenner responded to long-standing rumors about a romance with Cara Delevingne

 • 15416 переглядiв

Antonio Banderas's 29-year-old daughter rarely appears in public: what she looks like now

 • 21482 переглядiв

News by theme
Russia’s war will be increasingly felt at home, in Russia — Zelenskyy

 • 4936 переглядiв

Zelenskyy announced new contacts aimed at securing air defense packages

 • 4711 переглядiв