the-izumrud-residential-complex-in-odesa-is-finally-warm-the-keeper-told-about-the-launch-of-the-boiler-house

The Izumrud residential complex in Odesa is finally warm: The keeper told about the launch of the boiler house

 • 34365 переглядiв

For two years, more than two thousand Odesa residents were left without heating due to a conflict between the boiler house owner and the condominium association. A month ago, the head of the Odesa Regional State Administration, Oleh Kiper, signed an order together with the military command that allowed the city to take over the boiler house responsible for heating the building. As of today, the heat has been returned to the homes of Odesa residents - the boiler house has been launched, UNN reports, citing Kiper's Telegram message.

"I will keep an eye on the situation," the head of the OVA promised.

He also spoke about the role of the city authorities in resolving the situation.

According to Kiper, they negotiated with the bank to transfer the boilers and everything else needed to keep the boiler house running to the city hall for the winter period. And the city council members voted to allocate funds to resolve this problem.  

Lilia PodolyakSociety
    Popular
    US operation against Iran goes beyond traditional international law - Stubb

     • 14095 переглядiв

    Iran strikes US military bases and attacks American aircraft carrier

     • 16506 переглядiв

    Ali Khamenei is likely alive - Iranian Foreign Minister Araghchi

     • 13225 переглядiв

    Five explosions occurred in Dubai - smoke rose near Jebel Ali Port

     • 17138 переглядiв

    News by theme
    Iranian warship enters the Red Sea amid threats to shipping from Houthis

     • 32686 переглядiв

    Air Force warns Kyiv and region of ballistic missile threat

     • 33743 переглядiв

    Rocket attack on Kharkiv: 63 people injured, 91-year-old woman killed

     • 33495 переглядiв