As a result of the night shelling, there are several de-energized areas of Ukrzaliznytsia, backup power supply and diesel locomotives are being used, and all trains continue to run. This was reported in the telegram channel of the national carrier, UNN reports.
Details
In particular, at the Kharkiv junction, all trains, including Hyundai Rotem high-speed electric trains, will be powered by diesel locomotives.
The Kharkiv railway station has been switched to backup power, all systems are working, and the Fortress of Fortitude and children's space are open to visitors.
All train delays are traditionally available at uz-vezemo.uz.gov.ua, and we remind you that if you missed your flight due to shelling and forced metro shutdown in unbreakable Kharkiv or elsewhere, we will accept you on the next flight of the same destination with the same ticket
У Харкові пролунало близько 15 вибухів, ворог цілить по енергетичній структурі22.03.24, 04:58