Energoatom launches in-house production of Westinghouse nuclear fuel components

 • 3279 переглядiв

Atomenergomash (a separate subdivision) will produce the first batch of bottom nozzles for VVER-1000 fuel assemblies within four months. Qualification of the production of fuel assembly top nozzles is ongoing.

The "Atomenergomash" separate subdivision has received the materials necessary for the production of the first batch of components used in fuel assemblies. This was reported by NNEGC "Energoatom," according to UNN.

Energoatom is implementing agreements with Westinghouse Electric Sweden AB regarding the localization of the production of components used in fuel assemblies. SS "Atomenergomash" (AEM) has received the necessary materials for the production of the first batch of VVER-1000 fuel assembly bottom nozzles. The production period for the batch is four months,

- the report states.

The manufactured bottom nozzles will then be used in the production of fuel for Ukrainian NPPs.

It is noted that the qualification process for another fuel assembly component—top nozzles for fuel assemblies—is currently underway.

As a reminder

In 2025, SE NNEGC "Energoatom" and Westinghouse Electric Company signed agreements on the production of nuclear fuel in Ukraine. This will strengthen energy security and eliminate dependence on Russian supplies.

Olga Rozgon Economy
Popular
Ukrnafta is installing gabions around gas stations in Kyiv due to the threat of attacks

 • 2526 переглядiв

Koretskyi: Russian attacks could deprive Ukraine’s budget of UAH 70 billion in tax revenues

 • 3474 переглядiв

Russian oligarchs and businesses should have no peace in the world - Zelenskyy

 • 4058 переглядiв

Prime Minister Koretskyi: Ukraine is ready for a difficult winter and Russian attacks

 • 4184 переглядiв

CNN: Budanov is strengthening Ukraine’s international role by countering Russia

 • 5512 переглядiв

News by theme