Kiper told why Odesa is installing gas piston stations

 • 27236 переглядiв

Gas piston stations are being installed in Odesa to reduce electricity consumption by boiler houses and provide the population with more electricity.

In Odesa, gas piston stations are being installed for boiler houses to increase the amount of electricity for the population. This was reported by the head of the Odesa Regional State Administration Oleh Kiper, UNN reports.

Details

He clarified that the city and regional authorities are actively working to free up more electricity for the residents of Odesa region. After all, even imports from Romania do not help meet the region's needs.

"Today we import a lot of electricity.

I found out that if you buy electricity in Hungary and bring it through Zakarpattia, it is technically very difficult to get it to Odesa.

We are installing a lot of gas piston units in Odesa to close boiler houses and other stations that people need. We want to reduce electricity consumption and provide more to the population," he said.

Lilia Podolyak Society
Popular
Iranian Foreign Minister departs for Moscow for urgent meeting with Putin

 • 8404 переглядiв

Massive drone attack on Odesa: at least 13 people injured

 • 9796 переглядiв

Trump warned of a possible explosion of Iranian oil pipelines within three days

 • 6858 переглядiв

Explosion occurs near a store in Kharkiv: grenade fuse found

 • 12419 переглядiв

News by theme
Kiper told why Odesa is installing gas piston stations

 • 27236 переглядiв

A service for booking employees for mobilization has been launched on the Diia portal

 • 34341 переглядiв

A unique academic year at Harvard: more and more students learn Ukrainian

 • 16421 переглядiв

Russians attack a civilian car with a drone in Sumy region: there are wounded

 • 25072 переглядiв

Kiper calls politicians who promote themselves on people's pain “assholes”

 • 38563 переглядiв