ukenru
corrosion-of-metal-elements-and-formation-of-mineral-deposits-an-expert-on-the-causes-of-the-destruction-of-the-tunnel-of-the-blue-line-of-the-metro

Corrosion of metal elements and formation of mineral deposits: an expert on the causes of the destruction of the tunnel of the "blue line" of the metro

 • 34130 переглядiв

The corrosion of metal elements and the formation of mineral deposits indicate long-term processes that led to the destruction of the tunnel of the blue line of the Kyiv subway. Timely detection of negative processes and appropriate measures would have helped to avoid an emergency.

The corrosion of metal elements of supporting structures and the formation of mineral deposits led to the technical condition of the tunnel of the "blue line" of the Kyiv subway. Timely detection of negative processes and appropriate measures would have helped to avoid an emergency. This was told by Tetyana Arnaut, a forensic expert of the National Scientific Center of the "Institute of Forensic Expertise named after Honored Professor Mykola Bokarius", on the air of the telethon, UNN reports .

The subway tunnel in the study area is located in difficult engineering and geological conditions and requires close monitoring. The corrosion of metal elements of the supporting structures and the formation of mineral deposits indicate the long-term processes that led to the current technical condition of the tunnel. Therefore, timely detection of negative processes and appropriate measures would have helped to avoid this emergency,

- Arnaut said.

Details

She added that the experts conducted a number of examinations, namely: examination of materials of substances and products - a study of the formation of growth; fire-technical examination; computer-technical examination; examination of metals and alloys; construction-technical examination; engineering-technical examination.

We conducted seven inspections of metro tunnels to identify all the factors that could have contributed to the failure of the metro tunnel. In the presence of experts, we removed fragments of reinforcing bars of the tunnel's supporting structures and mineral formations - growth. The examinations have been completed, some of them have already been submitted to the pre-trial investigation body, and the other part will be submitted in the near future,

- Arnaut added.

Recall

In Kyiv, train traffic between Demiivska and Teremky metro stations has been closed since December last year for urgent repairs to the overpass tunnel . The estimated duration of the repair is 6 months.

Avtostrada Group is currently carrying out all the work on the emergency section of the blue line of the Kyiv metro between Lybidska and Demiivska stations at its own expense. In particular, the company has fenced the construction site and temporarily reinforced the tunnel vault.

Pavlo Bashynskyi

Society