it-will-be-very-difficult-to-restore-normal-operation-of-znpp-without-kakhovka-reservoir-ex-snriu-chairman

It will be very difficult to restore normal operation of Zaporizhzhya NPP without the Kakhovka reservoir

 • 24512 переглядiв

It will be difficult to resume operations after the de-occupation of ZNPP without the Kakhovka reservoir, as there will be simply not enough water to cool all the units.

This was announced during a briefing in the Media Centre of Ukraine by Hryhoriy Plachkov, former Chairman of the State Nuclear Regulation Inspectorate, reports UNN correspondent.

Without the Kakhovka Reservoir, it will be very difficult to restore NPP operation, because there will not be enough water for cooling and electricity generation for all power units

- Plachkov says.

According to him, the Russians will do everything to prevent us from exploiting it immediately.

"One of their ideas is to make it so that either we will have to repair this plant for a very long time or we will not be able to return it to commercial operation," he added.

Recall

Water has started to flow into the Kakhovka reservoir again. Recent satellite imagery shows that a large part of the previously dried up area of the former reservoir is now covered with water.

Кількість жертв атаки рф на Одещину зросла до 511.04.24, 13:19

Iryna Kolesnik

War

    Popular

    News by theme

    Russian strike on Mykolaiv: a teenage girl is among the injured

     • 22417 переглядiв

    The Ministry of Defense won arbitrations for over UAH 108 million

     • 23149 переглядiв

    Another batch of "Sabre" robotic turrets to be delivered to the front line - Fedorov

     • 21627 переглядiв

    Drones and generators: Lithuania handed over a new batch of aid to Ukraine

     • 23700 переглядiв

    HACCU confiscates property of former Minister of Education Tabachnyk

     • 21569 переглядiв

    Ukraine and Latvia sign bilateral security agreement - Zelenskyy

     • 23291 переглядiв